......................................................................................................................................................................................................................
Community College of Aurora Building 903 Addition/Remodel

Community College of Aurora Building 903 Addition/Remodel

Location: Aurora, CO

Completed: 2012

Project Description: 6,000 sf building addition, with a 4,000 sf interior remodel that occurred in 3 phases.  The building addition, which was designed to be the symbolic entry to the campus, provides a new lobby, welcome desk, and multi-purpose meeting space.  Existing classroom spaces were remodeled to become faculty office space, student gathering space and 2 chemistry labs. Outside, the entrance plaza was redesigned to include new paving, seating, and landscape to enhance student activity and community.

Completed while employed at AR7/NAC Architecture.  Photos by Stuart Crawford.

CCA2 copy.jpg

Community College of Aurora Building 903 Addition/Remodel

Location: Aurora, CO

Completed: 2012

Project Description: 6,000 sf building addition, with a 4,000 sf interior remodel that occurred in 3 phases.  The building addition, which was designed to be the symbolic entry to the campus, provides a new lobby, welcome desk, and multi-purpose meeting space.  Existing classroom spaces were remodeled to become faculty office space, student gathering space and 2 chemistry labs. Outside, the entrance plaza was redesigned to include new paving, seating, and landscape to enhance student activity and community.

Completed while employed at AR7/NAC Architecture.  Photos by Stuart Crawford.

Community College of Aurora Building 903 Addition/Remodel
CCA2 copy.jpg